Figure 3-10 Pulling out an inner rail
2. Aligning the nail heads on the server with their L-shaped cutouts on the rails, place the
server onto the rails. See step (1) in Figure 3-11.
RH2288 V3 Server
User Guide
3 Installing and Removing the Server
Issue 32 (2019-03-28) Copyright © Huawei Technologies Co., Ltd. 73