RMS-SNMP01A SNMP Card
User Manual
10 Monitoring Batteries by Using iBAT 2.0
Copyright © Huawei Technologies Co., Ltd.
8. Ensure that the number of BIMs for a battery string is the same as the number of
batteries in the battery string set on the Config > Comm. Config page, and is not greater
than the number of batteries in the battery string set on this page.
Step 7 Verify whether the operation is correct. Choose Monitoring > Real-Time Data > Battery
String Settings, and you can view the data of batteries. Choose Monitoring > Active alarms,
and there is no alarm (such as CIM number inconsistency, BIM communication failure). Then
the operation is correct. If the operation is incorrect, check whether each step is performed
correctly.
----End
10.3 CIM Control
On the WebUI, choose Monitoring > Control > CIM Control to control and maintain the
CIMs and BIMs. For details, see 4.4.4 Control Page.