UPS5000-A-30 kVA & 40 kVA & 80 kVA 
User Manual 
 
Copyright © Huawei Technologies Co., Ltd. 
 
Figure 3-74 Connecting signal cables in a UPS5000-A-30 kVA/40 kVA dual-bus system 
 
 
Connecting Other Signal Cables 
Connect the signal cables for each single UPS in a parallel system. 
3.4 Installation Verification 
Table 3-8 lists check items. 
 
 
Check items 09 and 10 carefully. Otherwise, the UPS may break down. 
Table 3-8 Installation checklist 
Consistency between system 
configurations and delivery 
configurations 
The system configurations, including models 
and the number of units, comply with the 
contract. 
Cables are routed properly and meet 
engineering requirements. 
Input and output power cables and battery 
cables are securely connected, and spring 
washers have been flattened to prevent them 
from falling off and causing accidents. There 
is no risk of disconnection. 
Marks for tightened screws   
Tightened screws are marked.