UPS5000-A-30 kVA & 40 kVA & 80 kVA
User Manual
5 Operations
Copyright © Huawei Technologies Co., Ltd.
159
The mains input is normal.
Batteries are properly connected.
Batteries are not in the equalized charging state.
Procedure
Step 1 Log in to the WebUI.
Step 2 On the Monitoring > Control > System Commands and Tests page, click Start next to
Forced equalized charging to start a forced equalized charging test.
Figure 5-9 Starting a forced equalized charging test
Click Stop next to Forced equalized charging in any of the following cases:
The forced equalized charging test duration reaches the forced equalized charging protection time
(1224 h, 18 h by default).
The UPS generates a battery overtemperature, overvoltage, or overcurrent alarm.
An alarm is generated.
----End
5.6.2 Shallow Discharge Test
Before conducting a shallow discharge test, check whether the requirements of a shallow
discharge test are met. If the requirements are met, the button for starting a shallow discharge
test is available. Otherwise, the button is unavailable.
Before a shallow discharge test, ensure that: