UPS5000-A-30 kVA & 40 kVA & 80 kVA
User Manual
4 LCD and WebUI
Copyright © Huawei Technologies Co., Ltd.
121
Figure 4-27 Control screen
Starting the Inverter
You can start the inverter manually by pressing Startup.
Shutting Down the Inverter
You can shut down the inverter manually by pressing Shutdown.
Maintaining Batteries
Figure 4-28 Maintain Batteries screen
Item
Description
Update Installation Date
You can update the battery installation time to the current
system time.
NOTICE
When batteries connect to the UPS for the first time, set Update
Installation Date on this screen to ensure the battery installation
time is the same as the current time and avoid the 0036-2
Battery maintenance reminder alarm.
Forced eql. chg.
Perform equalized charging on batteries forcibly.
Shallow Discharge Test
Partially discharge batteries. A shallow discharge test can
be conducted to test the battery loop reliability and
short-time discharge capacity when the batteries have not
discharged for a long time.
Capacity Test
Fully discharge batteries. A deep discharge test is
conducted to obtain the battery discharge performance
data.