95
4. System Setup
Example (1) :
If interface select
Chuck open
Eject new bar with turret :
(Main program)
Chuck open
M00 (CNC waiting)
Chuck close
Cutting
/ M98 Pxx (go to sub program)
M99 ( return)
Pxx (Sub program)
( 1 ) Chuck open
( 2 ) G 04 X 5.0 ( T2 delay 5.0 sec )
( 5 ) W – 100
(turret come to loading position)
( 6 ) M00(CNC waiting)
Chuck close
Part off
M99 (go to main program)
- If CNC interface provided with chuck open
signal only without M00 feed back signal ,
normally “ By time “ will be used .