POST-INSTALLATION
5-2 HySpeed HT2000 Instruction Manual
19
Introduction
Prior to operating the system, perform a post-installation system checkout to ensure that the pre-installation
and installation requirements and connections are correct, and to make any necessary final adjustments
before actual production cutting begins.
Before proceeding with the system checkout:
• Ensure that your cutting environment and that your clothing meet the safety requirements outlined in the
Safety section of this manual.
• Be certain that all pre-installation and installation requirements have been met. Refer to Section 3
Pre-Installation and Section 4 Installation in this manual.