Installation‐CoolantReservoirFilling
23
Figure10:ChillerPlumbing&ElectricalConnectivity
6.9  CoolantReservoirFilling
Whenthechiller’splumbingconnectionshavebeeninstalledthereservoirmustbefilledwithPlasmaCutting
SystemManufacture’sre commendedcoolant.RefertoHyperthermequipmentcoolantrequirementsforproper
coolantrequirements.Donotusetapwater.
Tofillthechiller’scoolantreservoir:
1.  Removethedoorpanel,sideblockerpanels,andupperblockerpanelasdescribedinSection6.4.2.
2.  Removethefillportcapfromthetop ofthetank.
3.  Fillthereservoirwiththemanufacturer’srecomme ndedfluidwhilemonitoringtheTankLevelSight
Gauge(RefertoFi
gure10).ThereservoirshouldbefilleduntilthelevelisneartheHighTankLevel
label.Thereservoircapacityis10.5gal(40L).
4.  Reinstallthereservoirfillportcapandhandtighten.
5.  Replacetheupperblockerpanel,sideblockerpanels,anddoorpanelasdescribedinSection6.4.2.
PROCESSFLUIDOUTLET
TANKLEVEL
SIGHTGAUGE
TANKDRAIN
PORT
INTERLOCKCONNECTION
ETHERNETCONNECTION
PROCESSFLUIDINLET
Hypertherm, Inc. Part Number: 810540