Installation‐RefrigerantFilling
24
NOTICE
Thechillerwillrequiremorecoolantthanthevolumeslistedabovetofillthechillerinternal
plumbing,plasmacuttingsysteminternalplumbing,andtheconnectinghoses.
Afterthepumpshavebeenstartedforthefirsttime,additionalcoolantwilllikelyberequired
astheinternalsystemcomponentsarefilledwithcoolant.
Whe
nthechiller’scontrollerispowered,thecoolantreservoirlevelcanbemonitoredviathe
controller(refertoSection8.5).
6.10 RefrigerantFilling
IfthechillerisinstalledinafluorinatedgasimportrestrictedcountryortheEuropeanUnion,itissubjecttothe
F‐gasregulations.FortheseapplicationstheDTSchillerpartnumber802092isshippedwithanitrogencharge
andhasnorefrigerant.Priortostartupthechillerisrequiredtobecharg
edwithrefrigerant.DTScansupport
chargingtherefrigerationthroughitscertifiedcon tractornetwork.ForDTSserviceinformationrefertoSection
12.
6.11 InstallationChecklis t
TransportandLocationofChiller
Unpackandcheckreceivedchiller.
Sufficientclearanceforintakeandexhaustairhasbeenmaintainedaroundthechiller.
Sufficientclearanceforserviceaccesshasbeenmaintainedaroundthechiller.
Electrical
Supplyvoltage,current,phase,andfrequencymatchchiller’srequirement.
Incomingmainpoweriswiredcorrectly.
Incomingpowergroundwireisconnectedtogroundlugonelectricalpanel.
Chillerhasbeenenergized(maincircuitbreakerdisconnectturnedtoONposition)foratleast8
hourspriortofirstrun(re
fertosection7.1).
Electricalserviceconformstoallapplicablenationalandlocalcodes.
Changefrequencysetpointonthecontrollerifinstalledina50Hzcountry(seeFigure31 in
Section8.7)
Plumbing
Supplyandreturnconnectionsarecorrectforbothcooling circuits.
Plumbingisnotdead‐headed:nokinksinhoses,valvesbetweenchillerandplasmasystemare
fullyopened,etc.)
Plumbinghasbeencheckedforleaks.
Coolantreservoirisfilledwiththecorrectquality andtothecorrectlevel.
Hypertherm, Inc. Part Number: 810540