Commissioning and Trial Run
‑40‑
2.1.4 Commissioning Flowchart in PMVVC Control Mode
Figure 2‑4 Commissioning flowchart in PMVVC control mode
2.2 Commissioning Procedure
2.2.1 Inspection Before Power-on
Check the following items before powering on the drive.