14
Socket Head Bolt, 3 x 8mm
(x8)
d
e
R
2-
3
MA
I
N
F
R
A
M
E
ASSEMB
L
Y 3
Socket Head Bolt, 3 x 8mm (1pc)
Button Head Bolt, 3 x 5mm (8pcs)
Button
Head Bolt, 3 x 5mm (8pcs)
Rod Guide
Nylon Lock Nut, 3mm
Nylon Lock Nut, 3mm
(1pc)
Frame Brace Plate (2pcs)
13
15
Table of Contents
Main Page
Assembly Instructions
1
Table of Contents
2
Introduction
4
Key Features
4
Preassembly Warning
5
Recommended Radio System
5
Items Required to Complete Assembly
6
Clutch Bell/Start Shaft Assembly
7
Bevel Gear Assembly
7
Tail Drive Transmission Assembly
8
T-Arm Lever Assembly
8
Elevator A-Arm Assembly
9
Double Main Drive Gear Assembly
9
Fuel Tank Assembly
10
Frame Support Assembly
10
Front Tray Assembly
11
Main Frame Assembly 1
12
Main Frame Assembly 2
13
Main Frame Assembly 3
14
Clutch Bell Installation
15
Tail Pinion Unit Installation
16
Ccpm Levers Installation
17
Gyro Tray/Bracket Attachment
19
Tank Frame Assembly
20
Fuel Tank Installation
21
Landing Struts Adapter Installation
22
Landing Gear Installation
23
Main Shaft/Main Drive Gear Installation
24
Cooling Fan/Clutch Installation
25
Engine Installation
26
Cooling Fan Shroud Installation
27
Installation of the Muffler/Fuel Line Connections
28
Swashplate/Washout Installation
29
Mixing Arm Installation
30
Rotor Head Assembly
31
Seesaw Shaft Installation
32
Rotor Head Installation
33
Control Rod Installation
34
Tail Drive Shaft Assembly
35
Tail Boom Installation
35
Tail Gear Case Installation 1
36
Tail Gear Case Installation 2
37
Tail Pitch Control Lever Installation
38
Tail Center Hub Assembly
39
Tail Blade Holder Assembly
40
Tail Boom Brace Assembly
41
Tail Boom Brace Installation
41
Tail Bellcrank Installation
42
Tail Control Rod Attachment
43
Radio System Preparation
44
Understanding the Ccpm Control Systems
45
Important Ccpm Programming Do's and Don
47
Ccpm Software Initial Adjustments
48
Jr 12X Programming
49
Jr X9303 2.4 and Xp9303: Programming
53
JR 7202 and SPEKTRUM Dx7Se and DX7: PROGRAMMING
57
Servo Installation 1
61
Servo Installation 2
62
Servo Horn Installation
63
Ccpm Control Rod Attachment
64
Checking the Swashplate for Level
65
Tail Control Linkage Attachment
66
Throttle Linkage Attachment
67
Gyro/Receiver/Battery Installation
68
General Radio Setup Information
69
Final Servo Adjustment and Radio Setup
71
Pitch Range and Curve Settings
72
Body/Main Rotor Blade Attachment
73
Final Preflight Check
74
Blade Tracking Adjustment
74
Blade Tracking Identification
75
General Maintenance
76
Replacement Parts Listing
78
Warranty Information
102
Related product manuals
JR Vibe 90 3D
97 pages
JR Vigor CS
92 pages
JR Voyager E
72 pages
JR Venture CP
84 pages
JR ERGO
83 pages
JR G400
2 pages