EasyManua.ls Logo

JR Vibe 90SG - Clutch Bell;Start Shaft Assembly; Bevel Gear Assembly

JR Vibe 90SG
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
Start Shaft
Clutch Bell Assembly
Pinion Gear
Start Shaft
Bearing Block
Setscrew,
4 x 4mm
Complete Assembly
Starter Hex Adapter
deR
neerG
Bearing Case Direction
Top
Complete Assembly
TIP: Clean areas with
rubbing alcohol to
remove any oil residue
before applying
threadlock.
Install the bearing
case as noted in
the drawing.
1-1 CLUTCH BELL/START SHAFT ASSEMBLY
1-2 BEVEL GEAR ASSEMBLY
Setscrew, 4 x 4mm (1pc)
Setscrew, 4 x 6mm (4pcs)
Start Shaft
Top Bearing Block
neerG
Tail Drive Joint
Setscrew, 4 x 6mm (4pcs)
Tail Pinion Unit Bearing Case B
Bevel Gear Shaft
deR
Setscrew, 3 x 6mm (1pc)
Bevel Gear Pin (1pc)
Setscrew, 3 x 6mm
Bevel Gear T21
Bevel Gear Pin
Bevel Gear T21
long
short
Bevel Gear T25
(Use this.) (Use this in step 1-3)
(x4)
deR
Secure so that the Setscrews are engaged
in the D-shade recess
Tighten the Setscrews 4 x 6mm evenly on all
sides of the Tail Drive Joint to ensure no runout.
Optional: Install typical 4mm
diameter governor magnet in
provided clutch bores with a drop
ofthinCA.
Be sure the Setscrew 4x4mm is installed
onto the at spot on the start shaft to
prevent it from slipping.
Leave a small amount of play between the
starter hex adapter and start shaft bearing
block while installing the Setscrew 4x4
onto the start shaft, otherwise the Clutch
BellAssemblymaynotrotatefreely.
NOTE:YourkitalsoincludesJRredand
green threadlock. Unlike conventional
U.S.-made threadlock, JR red is the
U.S.equivalentofblue.JRgreenisthe
equivalentofU.S.red.

Table of Contents

Related product manuals