EasyManua.ls Logo

JUKI SADE - 9 Transport and Handling; 9.1 Transport and Handling

JUKI SADE
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Industrial Sewing Machine SADE
119
1) Remove metal fixture from the filter
clamp.
2) Remove filter clamp .
3) Remove filter .
4) Clean up filters , and oil reservoir
of the oil pan.
Be sure to clean up the oil reservoir of the oil pan and the filter case approx-
imately once a month. If the filter is clogged with soil, lubrication fails result-
ing in trouble.
Adjusting the oil quantity in the hook see clause 5.2.
9 TRANSPORT AND HANDLING
Transportation applies only to the stage of machine delivery to the client. Details on the
delivery and transport are described in the clause 4.1.
When moving the machine on-site work this action can be performed in 2 persons hold-
ing the worktop. You can also use lifting equipment with sufficient capacity.

Table of Contents

Related product manuals