EasyManua.ls Logo

Kemper 345plus - Loading with a Crane

Kemper 345plus
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Haulage
KM00321,00003C7 -19-17JAN11-1/1
Loading with a Crane
NOTE: Remove spiral conveyors (A) for access
to the hanging points.
When reinstalling spiral conveyors (A), pay
attention to the correct installation position. Do
not swap spiral conveyors!
Models 375
plus
and 390
plus
must be unfolded to use the
hanging points underneath the spiral conveyors (A).
CAUTION: When loading the rotary harvesting
unit with a crane, always use the hanging points.
This will prevent the machine from toppling over.
Make sure to use chains or slings that meet the
weight requirements of the rotary harvesting
unit (see Specifications Section).
When loading in this way, you must pay
extreme attention and use additional securing
chains if necessary.
When loading the rotary harvesting unit with a crane,
chains or slings with the relevant length must be used as
shown on illustration.
A—Spiral Conveyors
B—1500 mm (4 ft. 11.05 in.)
C—1900 mm (6 ft. 2.80 in.)
KM1000963 —UN—14AUG09KM1000962 —UN—14AUG09
15-2
031519
PN=24

Table of Contents

Related product manuals