EasyManuals Logo
Home>KERN>Measuring Instruments>MRS120-3

KERN MRS120-3 User Manual

KERN MRS120-3
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
85
MRS-BA-defsi-0410
Assemble the in-use cover for the display
Open the hood and insert the draftshield (1), making sure that it
is placed on flat.
Insert the pan support (2) and turn it so that it locks securely in
place.
Insert the sample holder (3) as shown.
You can now place an aluminium pan (4) on the pan support.
NOTE
All the parts must be attached together without exerting undue force.
Do not apply any force. If you have any problems, the KERN
customer service will be happy to help.
3.4 Choosing a suitable location
In order to ensure that the moisture analyzer functions properly,
select a location that fulfils the following criteria:
Permissible ambient temperatures
-
Temperature: 5°C ... 40°C
-
Relative humidity: 25% ... 85%, non-condensing
Put the instrument on a rigid, firm horizontal base, preferably
exposed to no vibrations
Make sure that the instrument cannot be shaken or knocked
over
Do not expose it to direct sunlight
Avoid drafts and excessive temperature fluctuations
Leave enough clear space around the instrument to prevent a
build-up of heat.
Do not expose the instrument to high levels of moisture for long
periods of time. Avoid letting condensation form on the instrument.
If instruments are cold, let them warm up to room temperature
(approx. 20°C) before connecting them to the mains.
Condensation is practically impossible on instruments which are
connected to the mains.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KERN MRS120-3 and is the answer not in the manual?

KERN MRS120-3 Specifications

General IconGeneral
BrandKERN
ModelMRS120-3
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals