EasyManuals Logo

Keysight Technologies N5193A User Manual

Keysight Technologies N5193A
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #167 background imageLoading...
Page #167 background image
157
Keysight Technologies
Agile Signal Generator
Service Guide
4 Post-Repair Procedures and Operational
Performance Verification
Post Repair Procedures
This chapter provides information that will enable you to return an instrument
to full operation following the replacement of any instrument assembly. The
following tables list the adjustments and performance verification tests needed
after an assembly replacement.
After an assembly is replaced, find the assembly that has been replaced at the
top of the table, and then perform the recommended adjustments and
performance verification tests. Making the recommended adjustments and/or
performance verification tests doesn’t guarantee all published specifications
are being met. Only a full instrument calibration will do this.
Assemblies A1 - A19
After replacing assemblies A1 - A19:
for Post Repair Adjustments, refer to the table on page 160
for Post Repair Performance Tests, refer to the table on page 161
For the instrument to meet performance specifications and for accurate self- test results, allow a
warm up period of one hour within an operational temperature range of 0 to 55 °C. For more
information, refer to the UXG signal generator Data Sheet.

Table of Contents

Other manuals for Keysight Technologies N5193A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keysight Technologies N5193A and is the answer not in the manual?

Keysight Technologies N5193A Specifications

General IconGeneral
BrandKeysight Technologies
ModelN5193A
CategoryPortable Generator
LanguageEnglish

Related product manuals