Chapter 14 279
Post-Repair Procedures
Post-Repair Procedures
Post-Repair Procedures
Table 14-1 lists the adjustments and performance verification tests needed after an
assembly replacement.
After an assembly is replaced, find the assembly that has been replaced in the
left-hand column, and then perform the recommended adjustment and/or
performance verification test. Making the recommended adjustments and/or
performance verification tests doesn’t guarantee all published specifications are
being met. Only a full instrument calibration will do this.
NOTE Refer to the analyzer user’s guide for information on instrument warm-up before
performing any of the procedures listed in this chapter.