281 Chapter 14
Post-Repair Procedures
Post-Repair Procedures
NOTE Some Adjustment tests may be found in the Utility portion of the Test Plan.
A9
L.O. Assembly
Y
b System, Alignments, Align Now,
All will run at instrument power up
10 MHz Frequency Reference Adjust
50 MHz Calibrator Amplitude Adjust
Frequency Response (All Adjustments)
Frequency Readout Accuracy
Frequency Reference Accuracy
Phase Noise (All Tests)
Absolute Amplitude Accuracy
Count Accuracy
Frequency Response (All Tests)
Spurious Responses
a. Calibration Application Software is required for CXA performance tests and adjustments. For details go to http://www.agilent.com/find/calibrationsoftware
b. The instrument software MUST be reinstalled. See the Instrument Software chapter for information on how this is done. Running an update or reinstalling instrument software will
synchronize the FPGA with the instrument software.
c. See the BIOS Setup Changes section below for details.
d. See the Calibration File Backup section below for details.
Table 14-1 Post-Repair Testing Requirements (Continued)
Assembly Changed
or Repaired
Does the Assembly contain
FPGA code?
Perform the following adjustments in the order listed
a
Perform the following performance tests after the
adjustments are completed
a