Service ManualService Manual
Operating Lights marLEDOperating Lights marLED
®®
E9 / E9i / E15E9 / E9i / E15
V V 1.0 1.0 5757
Configuration on the programming Configuration on the programming adapteradapter
4 Slave4 Slave
5 Program5 Program
6 Master6 Master
7 Run7 Run
••
Set the right switch (5) to “Program”.Set the right switch (5) to “Program”.
•• Use the left switch to select Master (6) or Slave (4) DSP.Use the left switch to select Master (6) or Slave (4) DSP.
•• Turn on power supply and switch on the marLEDTurn on power supply and switch on the marLED
®®
E9 / E9i / E15.E9 / E9i / E15.
The programming mode is activated only during power up.The programming mode is activated only during power up.
Programming instructions MasterProgramming instructions Master
••
Use the left switch to select Master (6) DSP.Use the left switch to select Master (6) DSP.
Use of the C2Prog PC soUse of the C2Prog PC softwareftware
•• Start the C2Prog.exe program.Start the C2Prog.exe program.
••
For the update of the Master DSP, under “File” select the *.ehx file to be programmed.For the update of the Master DSP, under “File” select the *.ehx file to be programmed.
•• Make the settings shown below under “Programming Configuration”.Make the settings shown below under “Programming Configuration”.
••
Select the interface (2) under “Port”.Select the interface (2) under “Port”.
••
Click the button “Program” (3).Click the button “Program” (3).
Program update Master DSP starts.Program update Master DSP starts.