1.6 Date of issue
The date of issue of the present Instructions of Assembly and Use is the
rstofoctober2017.
2. Use of product
2.1 Intended use
The mobile aluminium working scaffold is a mobile scaffold (mobile working plat-
form).Itisclassiedinscaffoldgroup3(capacityof200kgperm
2
of accessible
platform area). The maximum permissible load is thus 180 kg with uniformly distri-
buted load. All work must be carried out by standing on the platform. The scaffold
may only be climbed on the inside.
The maximum extended height is 5 m in closed rooms and outdoors.
The scaffold may only be installed on level ground with the necessary load
strength. Using a spirit level, check the scaffold for proper vertical and
horizontal alignment. The maximum permissible angle of inclination is 1%.
Scaffolds that are not equipped with a height adjustment mechanism must
be aligned by means of unbreakable and non-slip chocks.
Before using the scaffold, ensure that all necessary safety measures have
been taken and that the scaffold has been properly erected according to the
instructions in the installation and user manual. If necessary, protect the
scaffold from tilting by using ballasts or outriggers.
2.2 Not intended use
Theworkingscaffoldmayonlybeusedforthepurposespeciedin2.1(intended
use).Notintendeduseincludes:Adeviationofthisuseisclassiedasnot
intended use within the meaning of ProdSG (of 08.11.2011). This is also valid in
caseofthedeanceofthenormsandregulationsindicatedinthisInstructionsof
Assembly and Use. Not intended use is among others:
- Installation of bridges between the mobile scaffold and a building or another
construction.
- Connection of several mobile scaffolds to form a single platform or scaffold.
- Use of the scaffold as a climbing aid (ladder) to access other scaffolds.
- Attachment and use of lifting gear attached to the scaffold.
3. Safety instructions
3.1 Applicable regulations
The regulations of EN 1004 apply to the erection, dismantling, stability and use of
the working scaffold.
3.2 Safety regulations for erection and use
- The scaffold may only be erected and taken down by personnel who
are fully familiar with the content of this installation and user manual.
- At the minimum 2 persons will be required for the assembly and the
dismantling.
-Thescaffoldmaybeerectedandusedexclusivelyonalevelandsufciently
stabile ground able to carry its weight.
- Only the use of faultless original parts of the scaffold system is allowed.
- The wheels must be arrested prior use of the scaffold by pressing down of the
brake handle and all components of the scaffold must be checked regarding the
correct assembly and the functioning.
- All work must be carried out by standing on a platform.
- Jumping on the accessible platform areas is prohibited.
- Do not lean over the railings or use them to push off against.
- Use of the scaffold is permitted up to a maximum wind force 6 (~ 45 km/h).
Prior exceeding the wind force 6, the scaffold must be dismantled or be used
in a wind protected area and to be secured there against tilt. Wind in excess of
force 6 can be recognized by noticeably restrained walking against the wind.
-Athreepartcompleteankprotectionconsistingofarailstrut,kneestrutand
rotating boards must be used for platforms on which a person is working. For
all intermediate platforms which will be used for assembly, dismantling and
rebuilding and climbing, no rotating boards are necessary.
- After completion of the work, the mobile scaffold must be properly
anchored and secured against unauthorised use. Alternatively, dismantle the
scaffold.
– Intermediate boards must be equipped with a side protection that does not
consist of boards; working platforms must be secured with side protection with
board.
-Ifthemobilescaffoldisusedoutsideofbuildings,secureittoaxed
structure, if this is possible.
- Stabilizers and ballast weights must be applied in accordance with these
Instructions for Assembly and Use.
43 44