7.2.1 Check List for Initial Operation
Install the machine according to assembly instructions of the machine.
Check all screws and nuts for firm attachment, observe prescribed torque.
Check all sensors to make certain they are correctly seated. Check the setting values and
set them, if necessary. Observe prescribed tightening torque.
Check safety devices.
• Lubricate the machine.
Check the oil on all gearboxes.
Adapt the hydraulic system to the tractor.
Check the density of the hydraulic system.
Check whether the tractor meets the requirements of the machine.
Check axle loads, minimum ballast and total weight.
Adapt the coupling points to the tractor, is necessary.
Check universal shaft length and adapt the length, if necessary.
In transport position, the cross conveyor must be checked for firm attachment.
Check the conveyor belt setting and the running behaviour, depending on the equipment of
the machine; refer to chapter Special Equipment “Conveyor Belt Setting”.
Vent the friction clutches.
Perform all machine functions (e. g. lifting and lowering) one after the other until the
hydraulic system is vented.