EasyManua.ls Logo

KUHN Venta 3030 - Page 87

KUHN Venta 3030
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9. - Instructions for work
Venta 3030-3530-4030
85
RN034AGB D
Seed Drill
Between the metering unit and the hopper base,
there is a hatch that stops the seeds from entering
the metering unit during transport or hopper filling.
- Remove tube clip (1).
- Open the gate valve.
- Insert and lock lynch pin.
1
- Lift and tip the calibration test flap (1).
The calibration test flap (1) is open.
1
- Remove the unit flow control bag on the left side of
the seed box.

Table of Contents