9. - Instructions for work
Venta 3030-3530-4030
85
RN034AGB D
Seed Drill
Between the metering unit and the hopper base,
there is a hatch that stops the seeds from entering
the metering unit during transport or hopper filling.
- Remove tube clip (1).
- Open the gate valve.
- Insert and lock lynch pin.
- Lift and tip the calibration test flap (1).
The calibration test flap (1) is open.
- Remove the unit flow control bag on the left side of
the seed box.