Venta 3030-3530-4030
86
9. - Instructions for work
RN034AGB D
Seed Drill
- Check the flow in accordance with the
information in the control terminal manual
ISOBUS VENTA/QUANTON S-2.
- Hitch the runoff flow bag at the level of the
holder (1).
- At the end of the flow check, close the calibration
hatch again, as requested by the control terminal.
- Put the flow runoff bag away again.