EasyManua.ls Logo

KUHN Venta 3030 - Page 88

KUHN Venta 3030
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Venta 3030-3530-4030
86
9. - Instructions for work
RN034AGB D
Seed Drill
- Check the flow in accordance with the
information in the control terminal manual
ISOBUS VENTA/QUANTON S-2.
- Hitch the runoff flow bag at the level of the
holder (1).
1
- At the end of the flow check, close the calibration
hatch again, as requested by the control terminal.
1
- Put the flow runoff bag away again.

Table of Contents

KUHN Venta 3030 - Page 88