EasyManua.ls Logo

L-Acoustics K2 - Page 51

L-Acoustics K2
192 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inspection and preventive maintenance
Moving parts
1. Press the push button. The ball-locking mechanism is retracted.
2. Release the button. The ball-locking mechanism is activated.
3. Insert the pin in each storage and rigging hole. Pull and rotate the pin.
The pin must remain inside the hole.
If the pin is inserted in two plates, the ball must pass through both plates and lock the pin in place.
If the check fails, immediately withdraw the product from use and contact L-Acoustics.
Related tasks
Rigging part inspection (p.43)
K2 owner's manual (EN) version 1.1 51

Table of Contents

Other manuals for L-Acoustics K2

Related product manuals