KARA
KARAKARA
KARA
®
®®
®
M
MM
MO
OO
ODULAR
DULARDULAR
DULAR WST
WST WST
WST
®
®®
®
SYSTEM
SYSTEM SYSTEM
SYSTEM
rigging procedures using
rigging procedures using rigging procedures using
rigging procedures using
kara
karakara
kara-
--
-minibu
minibuminibu
minibu
VERSION 1.0
KARA_SRM_EN_1-0
w w w . l - a c o u s t i c s . c o m
54
5454
54
8. Set angle 0° on KARA#2 by applying step 5.
9. If the last enclosure to be placed in the flight-case is not attached to the KARA-MINIBU (KARA#4), apply steps 3,
7, 12, and 13 for KARA#4 and then apply the procedure a new time from step 2 for array KARA#1-3.
If the last enclosure to be placed in the flight-case is attached to the KARA-MINIBU (KARA#1), disconnect the link
points between the KARA-MINIBUEX stacking platform and SB18#2 by removing the four KARA-MINIBUEX
T-BLP from their link holes and re-inserting them into their storage holes.
Figure 61: Disconnecting the link points between KARA-MINIBUEX and SB18#2
10. Attach the KARA#1/platform assembly to KARA#2 by applying step 7.