EasyManua.ls Logo

LG MULTI V ARNU12GTRA4

LG MULTI V ARNU12GTRA4
520 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Indoor unit
Ceiling Cassette 4-way(2) _ 19
Indoor Units
10. Installation
10.2 Ceiling opening dimensions and hanging bolt location
Ceiling board
Level gauge
Ceiling
TM/TN Chassis
Unit:mm
875(Ceiling opening)
787(Hanging bolt)
684(Hanging bolt)
671
875(Ceiling opening)
840 Unit size
840 Unit size
• The dimensions of the paper pattern for installation are the same as those of the ceiling opening dimensions.
• Select and mark the position for fixing bolts and pip-
ing hole.
Decide the position for fixing bolts slightly tilted to
the drain direction after considering the direction of
drain hose.
• Drill the hole for anchor bolt on the wall.
• This air-conditioner uses a drain pump.
• Install the unit horizontally using a level gauge.
During the installation, care should be taken not to
damage electric wires.
CAUTION
Ceiling
Ceiling Board
Ceiling Board
Floor
Unit:mm(inch)
At least 1800(70-7/8)
4200(165-11/32) or less
1000(39-3/8)
or more
10(13/32)
or more
500(19-11/16)
or more
15(19/32)
±3(1/8)
500(19-11/16)
or more
300(11-
13
/16) or less
n TM/TN Chassis

Table of Contents

Related product manuals