10. Installation
Indoor unit
20 _ Ceiling Cassette 2-way
Indoor Units
10.5 Indoor Unit Drain Piping
• Drain piping must have down-slope (1/50 to 1/100): Make sure
not to provide up-and-down slope to prevent reversal flow.
During drain piping connection, be careful not to exert extra
force on the drain port on the indoor unit.
The outside diameter of the drain connection on the indoor
unit is 32mm.
Make sure to install heat insulation on the drain piping.
Piping material: Polyvinyl chloride pipe inner
diameter Ø 25mm and pipe fittings
The air conditioner uses a drain pump to drain water.
Use the following procedure to test the drain pump operation:
• Connect the main drain pipe to the exterior and leave it
provisionally until the test comes to an end.
• Feed water to the flexible drain hose and check the pip-
ing for leakage.
• Make sure to check the drain pump for normal operating
and noise when electrical wiring is complete.
• When the test is complete, connect the flexible drain
hose to the drain port on the indoor unit.
Heat insulation material: Polyethylene foam with
thickness more than 8 mm.
Drain test
Maintenance
drain port
Upward
routing
not allowed
Pipe clamp
Indoor unit
1/50~1/100
MAX 700mm
Feed water
Drain Pump
Drain pan
Flexible drain hose
(accessory)
Main
drain pipe
Glue the joint
Drain
port
Drain hose connection
Use the clip (accessory)
1/50~1/100 slope
Hanger
distance
Hanger Bracket
Max 700mm
Flexible drain hose
Insulation
Metal
clamp
Max 300mm
1~15m
CAUTION
The supplied flexible drain hose should not be strained.
A strained hose may cause leakage of water.