EasyManuals Logo

Lucent Technologies SLC-2000 Access System Central Office Terminal User Manual

Lucent Technologies SLC-2000 Access System Central Office Terminal
240 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #235 background imageLoading...
Page #235 background image
363-208-011, Appendix 3
Test Head Installation
Issue 1 November 1998 A3-9
Circuit Pack Verification
Step 1:
Verify that the SMU, LAN, and PDC are in the ARM shelf.
Step 2:
Verify that the MDC, T8U, and PTU are in the MDS shelf(ves) of the
subscriber circuits or drops to be tested.
NOTE:
The T8U is required for TR-08 operation only.
Step 3:
Verify that the DLC software is as follows:
COT: R 3.03.01 (or later)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lucent Technologies SLC-2000 Access System Central Office Terminal and is the answer not in the manual?

Lucent Technologies SLC-2000 Access System Central Office Terminal Specifications

General IconGeneral
BrandLucent Technologies
ModelSLC-2000 Access System Central Office Terminal
CategoryTouch terminals
LanguageEnglish

Related product manuals