Lynx
®
NGT-9000
Pilot’s Guide 2-1
Operation
CHAPTER 2
OPERATION
INTRODUCTION
This chapter describes preflight procedures for the panel and remote
mount Lynx NGT-9000. Operational information in this chapter is
specific to the panel mount Lynx NGT-9000.
Refer to Chapter 3 (Controls and Indicators) for operation information
for installations with a CP-2500 Control Panel or compatible display.
POWER (REMOTE MOUNT)
There is no power on/off switch for the remote mount version of the
Lynx NGT-9000. Depending on the aircraft, use either the battery
switches or avionics master switch to apply power.
Normal operation begins within 10 seconds of applying power.
During start up the unit checks for valid configuration data and
initializes self tests.
The GPS begins initializing.
If installed the CP-2500 shows GPS INIT while the GPS is
initializing.
If an ADS-B System Fail is displayed after 2 minutes, then
the GPS position was not acquired. If the ADS-B System Fail
is displayed in less than 2 minutes then a different problem
has been detected.
Cycle power to the Lynx NGT-9000 to restart GPS initialization.
If the problem continues, refer to the troubleshooting section
for possible corrective actions.
b. If installed the ADS-B Out Fail lamp flashes (1 second On/Off)
while the GPS is initializing. Lamp continues flashing until
GPS position is acquired.
1.
2.
3.
a.
•
•