EasyManua.ls Logo

MacDon D65 - Page 108

MacDon D65
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
214328 100 Revision A
Table .16 D65 Predelivery Checklist North America (continued)
üü
Item
Reference
Run-up procedure
6 Running up Header, page 81
Check hydraulic hose and wiring harness routing for
clearance when raising or lowering header and reel.
Check knife drive pulley(s) is rotating in proper direction:
clockwise on left side; counterclockwise on right side
(double knife only).
Check lights are functional.
Check reel lift cylinders extend fully.
Confirm reel movement: tilt, fore, and aft.
Post run-up check. Stop engine.
6.1 Performing Post Run-Up Adjustments, page
82
Check belt drives for heated bearings.
Check knife sections for discoloration caused by
misaligned components.
6.1.1 Adjusting Knife and Guards, page 82
Check for hydraulic leaks.
Check manual storage case contains operators manual
and parts catalog.
5.15 Checking Manuals, page 80
Date checked:
Checked by:
REFERENCE

Table of Contents

Other manuals for MacDon D65

Related product manuals