Page 26 / 100 Technical Notice V1.0 / 01.09
3 Model CSW 50/65/80
3.4 Commissioning
The unit has been checked, tuned and tested in
our workshops.
A. Make the hydraulic and electrical connections.
B. Fill the reservoir with liquid.
C. Start up the machine (1).
D. Check the rotation direction of the pump and the
exhaust fan.