General information
1.2.4.1 Operator's position
The P1 is designed and constructed to interlock with a machine, of which it becomes to all intents and
purposes, a sub-assembly.
Therefore refer to the final machine that the P1 will be installed in for the operator’s behaviours during all the
various operation processes, in particular during production and maintenance.
1.2.4.2 Operator's tasks
The operator assigned to the installation must:
1. lift, transport and store the P1;
2. assemble and adjust the P1;
3. remove the P1.
The operator’s tasks during normal work:
• No operator interventions are required while the P1 is operating: For more information see the final
machine’s manual.
The operator assigned to the maintenance must:
1. perform routine maintenance;
2. perform extraordinary maintenance;
3. signal unexpected situations (e.g. wear, failures, breakages, errors, etc.) not set out in this document
and therefore generated by unforeseen causes.