Installation and Start-Up | 3-33
5. After all of these checks have been made and verified, close the Up-
per/Lower Enclosures and tighten all M10 screws (9 ±1 Nm (80 in-lb)).
The sample gas should remain blocked in.
Use a soft, nonabrasive cloth to gently clean the joining areas (flame-
path) of the Upper and Lower Enclosures before closing them.
Replace the parts immediately if damage or wear is apparent. Contact
AMETEK immediately if there is any doubt about the integrity of any
flamepath.
6. Perform an Auto-Setup to optimize the PMT gains of the source
lamps. Information on how to do this is located in Chapter 6.
!
WARNING
!
CAUTION