VetPro DC Installation/Service Manual, 00-02-1606, Revision R01
125
Figure 121
3. Lift the shipping box and separate from the crate. There are two layers
of parts. Separate the top layer and place on the floor or remove each
piece individually.
NOTE: This is a two person job. Take extra care when handling the
articulating arm assembly to avoid any damage to the tubehead
.
Figure 122
4. Cut the transportation band from the lower layer that holds the mobile
base
.