TS571W Installation Instructions 21
S
S
N
N
T
L
L
V
P
● Secure the gate bracket with the
supplied hardware as shown.
● Once the gate post and gate
brackets are installed, reattached
the operator arm.
● Ensure the operator arm is level,
adjusting the post bracket location
if necessary.
● Once level, ensure all hardware is
tight.
● Remove excess bolt length with a
hacksaw.
Step 10
Step 11
PULL-TO-OPEN OPERATOR MOUNTING
Your Property