EasyManua.ls Logo

Milli-Q Millipore - System Maintenance Schedule; Maintenance Schedule Overview

Milli-Q Millipore
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
60 Milli-Q® Reference System
Maintenance Schedule
Consumables
Item
Maintenance needed
When
Q-Gard® Pack
Replacement
Prompted to by an LCD
message.
Quantum®
Cartridge
Replacement
Prompted to by an LCD
message.
POD Pak
Replacement
Prompted to by an LCD
message or as necessary.
Lamp
Item
Maintenance needed
When
UV 185 nm
Lamp
Replacement
Prompted to by an LCD
message.
NOTE:
It is recommended to have a Millipore SAS Field Service Representative change the UV
Lamp in the system.
The replacement of this lamp involves removing the cover of the system. The
instructions for replacing these lamps are not included in this User Manual. The
instructions are included with the replacement lamp.
Cleaning/
Sanitisation
Item
Maintenance needed
When
Inlet Strainer
Cleaning
Prompted to by an LCD
message or as necessary.
System
Sanitisation
Contact Millipore SAS for
more details.
Calibrating the
flowrate
Item
Maintenance needed
When
Flowmeter
Recalibration
New Consumable, Sensor
or change to Feedwater.
See ‘Calibrating the
Flowrate’ for more
information.

Related product manuals