EasyManua.ls Logo

Milli-Q Millipore - Rinsing the System

Milli-Q Millipore
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28 Milli-Q® Reference System
Rinsing the System
Procedure
Follow the steps below to rinse the System.
Step
Action
Diagram
1
Locate the clear tubing and the
barbed fitting from the System
Accessories Bag.
Screw the barbed fitting onto
the POD Unit.
Push one end of the clear tubing
onto the end of the barbed
fitting.
Place the other end of the clear
tubing into a sink.
NOTE:
Do not use any white tape on
the threads of the barbed fitting.
An O-ring located inside the
POD Dispenser ensures water
tightness.
2
Place the System into READY
Mode.
3
Push the POD Plunger all the
way down and then release it.
In a few minutes, water should
come out of the POD Unit.
4
Dispense water for at least
10 minutes.
Continued on next page

Related product manuals