74 Milli-Q® Reference System
Calibrating the Flowrate
When
The flowrate should be calibrated when a:
new consumble is installed such as a:
POD Pak or
Q-Gard® Pack and
Quantum® Cartridge.
sensor or major component is changed.
feedwater parameter has changed such as the:
pressure
setting of pressure regulator,
larger or smaller Reservoir or
Inlet Strainer cleaned
temperature changed (> 3°C).
Procedure
Follow the procedure shown in the Installation Chapter.