EasyManua.ls Logo

Milli-Q Millipore - Installation Steps Continued; POD Unit, Tubing, and Power Connections

Milli-Q Millipore
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22 Milli-Q® Reference System
POD Unit, tubing and power cord
Separate POD
Arm and Point
Of Delivery
Separate the POD Arm and the Point Of Delivery by cutting and removing the tape that
holds them together.
POD Arm
Place the POD and POD Arm onto the POD Mast as shown below.
Feedwater
tubing
The Feedwater tubing is connected to either a:
Reservoir, or
Loop (pipe end)
Reservoir
Connect the feedwater tubing according to the specifications supplied with the
Reservoir.
Continued on next page

Related product manuals