Milli-Q® Reference System 23
POD Unit, tubing and power cord, Continued
Loop
Install the Inlet Strainer as shown here.
Connect one end of the feedwater tubing to the Inlet Strainer.
NOTE:
A pressure regulator is normally required after the Inlet Strainer.
Connections to
System Cabinet
Follow the steps below.
Step
Action
Diagram
1
Plug one end of the feedwater
tubing to the Cabinet.
Open the valve on the other
end of the feedwater tubing to
allow water flow later.
2
Plug in the Termination Plug.
It must be plugged in
before the power cord.
3
Plug in the power cord. The
Main Display goes through a
series of start up screens.
4
Wait for the Main Display to
show a STANDBY Mode screen.
This may take up to a few
minutes.
Continued on next page
1
2
3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Milli-Q Millipore and is the answer not in the manual?

Milli-Q Millipore Specifications

General IconGeneral
Type of Water ProducedUltrapure Water
Resistivity18.2 MΩ·cm
Total Organic Carbon (TOC)<5 ppb
TechnologyReverse Osmosis, Ion Exchange, Ultrafiltration
Particle RemovalYes, through filtration
Storage CapacityVaries by model
DisplayTouchscreen display for system monitoring and control
DimensionsVaries by model
WeightVaries by model
Power Supply100-240 V AC, 50-60 Hz
Bacteria RemovalYes, through filtration and UV oxidation (depending on the specific Milli-Q system)