Do you have a question about the Nibe FIGHTER 1110 and is the answer not in the manual?
Details connections for Options 2 (room sensor), 3 (oil-fired boiler), 4 (electric boiler), and 5 (water heater).
Covers power connection requirements, external control, and outside sensor connection.
Ensures circuits are filled and vented, and provides a guide for filling and venting the collector system.
Covers filling the heating system, start-up inspection, and readjustment of heat medium and brine sides.
Presents the electrical circuit diagrams for single and three-phase configurations.
Provides a detailed circuit diagram illustrating component interconnections and logic.
A table containing comprehensive technical specifications across different FIGHTER 1110 models.
Provides causes and actions for low room temperature and hot water supply issues.
Guides on how to address HP/MS and LP alarms indicated by the system.
Instructions for draining heat medium/collector sides and helping the circulation pump to start.