EasyManua.ls Logo

Nibe FIGHTER 1110 - Docking Configurations; General Options and Option 1

Nibe FIGHTER 1110
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FIGHTER 1110 can be installed in several different
ways, some of which are described below.
Accessories such as room sensor kit RG 20, equip-
ment for controlling hot water VST 11, additional heat
ETS 11 etc. are ordered separately. The safety equip-
ment must be installed in accordance with current reg-
ulations for all docking options.
General
Option 1 FIGHTER 1110 docked with immersion heater
and hot water heater (floating condensing)
El VVB
NK
VVG
BK / JK
SF
AV
SÄV
SÄV
AV
AV
AV
AV
VXV
SF
AV
AV
C
i
r
k
.
p
u
m
p
V
ä
r
m
e
p
u
m
p
V
a
r
m
v
a
t
t
e
n
T
i
l
l
s
a
t
s
v
ä
r
m
e
L
a
r
m
K
o
n
t
r
o
l
l
e
r
a
a
t
t
v
a
t
t
e
n
f
i
n
n
s
i
p
a
n
-
n
a
n
i
n
n
a
n
d
e
n
i
n
-
k
o
p
p
l
a
s
.
1
R
0
UG
ELK
FG
EXP
VVB / ACK
FIGHTER 1110 prioritises heating of hot water via a
reversing valve (VXV). When the water heater/accu-
mulator tank (VVB/ACK) is fully charged the reversing
valve (VXV) switches over to the heating circuit. The
heat pump is then controlled by the outdoor sensor
(UG) in combination with the built-in flow sensor (FG).
The immersion heater (ELK) is connected automati-
cally when the energy requirement exceeds the
capacity of the heat pump. This option can also be
supplemented with a room sensor.
This option requires the accessories ES 11, and HWC
11.
Docking
FIGHTER 1110
For the Installer
16

Table of Contents

Related product manuals