2-22
Equipment
AN2016 Cabinet User Guide Rel 1.0 Standard May 1999
DDM+ and to the DSX-1 cross connect to interface with the AccessNode
ABM#1 shelf. The outbound DS-1 use the same equipment in the opposite
direction.
See Figure 2-13 and Figure 2-14 for a view of the equipment frame/bay layout.
Figure 2-13
672-line configuration (front view)
AN0057.eps
Future expansion
Heat exchanger plenum
Future expansion Future expansion
Front of cabinet
Frame/bay A Frame/bay C Frame/bay B
SPC compartment AC compartment Battery compartment
Heat exchanger plenum Heat exchanger plenum