EasyManua.ls Logo

Notifier AM2020

Notifier AM2020
268 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-45
Installation 15088: J 10/22/99
Step 1
Remove the two screws in the bottom
left corner of the MPS-24A or MPS-
24AE.
Step 2
Thread the two replacement screws through the MPM-2
bracket and through the two standoffs provided. Place
the MPM-2 assembly over the MPS-24A or MPS-24AE
and secure with the two screws.
Step 3
Complete the installation of the MPM-2 by
plugging the female connector on the meter
into Plug P7 on the MPS-24A or MPS-24AE.
Figure 3.4-1 Installation of the Main Power Meter
Section 3.4 The Optional Main Power Meter
The optional Main Power Meter (MPM-2) may only be installed on the Main Power Supply, MPS-24A or MPS-24AE
(refer to Figure 3.4-1).
www.PDF-Zoo.com

Table of Contents

Other manuals for Notifier AM2020

Related product manuals