EasyManua.ls Logo

Oracle Database Appliance - Page 108

Oracle Database Appliance
188 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install Power Distribution Board
108 Oracle Database Appliance Service Manual • February 2016
b.
Reconnect the chassis interlock switch cable [2].
c.
Align the power distribution board with the two power connectors on the
disk midplane module and slide the power distribution board forward until
the connectors seat.
d.
To secure the power distribution board to the system, use the holes in the
system side wall to access and tighten the two Phillips screws [3].
e.
Reconnect the power distribution board ribbon cable [4].
2.
Return the system to operation.
a.
Install both server nodes into the system.

Table of Contents

Related product manuals