Remove Power Distribution Board
Chapter5 • Servicing FRUs 105
c.
Install the server node into the system.
See “Install Server Node Into System Chassis” on page 140.
d.
Power on the server node.
See “Powering On Oracle Database Appliance (Original Version)” on page 142.
Servicing the Power Distribution Board (FRU)
The Oracle Database Appliance (original version) power distribution board (PDB) distributes
power from the power supplies to all system components.
The power distribution board is a FRU and can only be replaced by an Oracle-qualified service
technician.
Caution - Equipment damage. Follow antistatic precautions as described in “Performing
Electrostatic Discharge and Antistatic Prevention Measures” on page 34. Do not touch the
components along their connector edges.
Caution - Equipment damage. Remove all power from the system before removing or
installing the power distribution board. Power down both server nodes (also called system
controllers) and disconnect the power cords from the system before performing these
procedures. For instructions, see “Shutting Down a Server Node and Powering Off the
System” on page 31.
This section includes:
■
“Remove Power Distribution Board” on page 105
■
“Install Power Distribution Board” on page 107
Remove Power Distribution Board
1.
Prepare the system for service.
a.
Power off the system.
See “Shutting Down a Server Node and Powering Off the System” on page 31.
b.
Disconnect the power cords from the system.