EasyManuals Logo

Oracle SPARC T7-2 Installation Guide

Oracle SPARC T7-2
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
Handling Precautions
Handling Precautions
Caution - Deploy the anti-tilt bar on the equipment rack before beginning an installation.
Caution - The server weighs approximately 80 lb (36.28 kg) with two processors or 76.6 lb
(32.88 kg) with one processor. Two people are required to lift and mount this 3U server into a
rack enclosure when using the procedures in this document.
Caution - When completing a two-person procedure, always communicate your intentions
clearly before, during, and after each step to minimize confusion.
Related Information
“Physical Specifications” on page 15
“Installing the Server” on page 23
SPARC T7-2 Server Getting Started Guide
ESD Precautions
Electronic equipment is susceptible to damage by static electricity. Use a grounded antistatic
wrist strap, foot strap, or equivalent safety equipment to prevent electrostatic damage when you
install or service the servers.
Caution - To protect electronic components from electrostatic damage, which can permanently
disable the system or require repair by service technicians, place components on an antistatic
surface, such as an antistatic discharge mat, an antistatic bag, or a disposable antistatic mat.
Wear an antistatic grounding strap connected to a metal surface on the chassis when you work
on system components.
Preparing for Installation 21

Table of Contents

Other manuals for Oracle SPARC T7-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle SPARC T7-2 and is the answer not in the manual?

Oracle SPARC T7-2 Specifications

General IconGeneral
BrandOracle
ModelSPARC T7-2
CategoryServer
LanguageEnglish

Related product manuals