6
Ⅰ K3 Installation Checklist
Checklist before Installation
• Check the product transportation route.
• The product must be transported in a packed state.
If packing materials need to be removed before transportation, soft materials must
be used to prevent damage to the product.
• Before installation, confirm that all components are included in the packing box.
# Packing Component
1
Chair BOX
CHAIR ASS’Y, ARM REST “L”, “R”, HEADREST BOX
2
UNIT BOX
UNIT ASS’Y, FOOT ASS’Y, ASSIST TABLE ASS’Y (Distilled water tank ASS’Y)
3
TABLE BOX
DOCTOR TABLE ASS’Y, Hanaro Console Box, MONITOR ARM BOX, ASSIST BOX
(SCALER, ELECTRIC MOTOR)
4
LIGHT ARM BOX
DENTAL LIGHT ASS’Y, LIGHT POLE
5
LIGHT HEAD BOX
LIGHT HEAD ASS’Y
5
SEAT BOX
SEAT ASS’Y, BACKREST ASS’Y
7
STOOL BOX
STOOL ASS’Y, MOTOR COVER, BASE FRONT COVER, BASE BACK COVER
§ Check components in the box