Download Timing Explanation
At regular intervals of time The configuration files are downloaded at specified intervals of time, set in
minutes.
In the example below, the unit has been programmed to download
configuration files from the provisioning server every 3 days (4320
minutes).
A
B
CFG_CYCLIC_INTVL="4320"
A
B
C
A. KX-HDV100
B. Provisioning Server
A Power on
B 3 days later
C 6 days later
: Check
: Download
Document Version 2015-02 Administrator Guide 43
2.2.4 Downloading Configuration Files