4. Hand start and reinstall the left and right 5/16" hex key running belt tension adjust-
ment bolts and washers. Continue tightening bolts until snug and stop.
5. Tension the running belt to specification and verify alignment and tracking, see "Run-
ning Belt Tension and Tracking Adjustment" on page 62.
6. Reinstall the left and right Trim End Cap covers, see "Trim End Cap Covers Replace-
ment" on page 88.
7. Reinstall the left and right Landing Trim covers, see "Covers and Panels Replace-
ment" on page 80 and hood cover, see "Covers and Panels Replacement" on
page 80.
8. Do the Operation Verification tests (see "Operation Verification" on page 23) and
return to service.
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
Page 148
6 Replacement Procedures
Take-up Roller Replacement